
•Development time 2~3 weeks
•Delivery time(including development
time): 4~5 weeks
•Monthly production capability 100~200 pcs

•Development time 3~5 weeks
•Delivery time(including development
time): 6~8 weeks
•Monthly production capability 50~100 pcs

•Development time 4~8 weeks
•Delivery time(including development
time): 8~12 weeks
•Monthly production capability 30~50 pcs

•Development time 8~10 weeks
•Delivery time(including development
time): 10~16 weeks
•Monthly production capability >30 pcs

Precision module design

Robotic arm module design

Vision system architecture

Whole production line plan design

Tolerance analysis

Thermal flow analysis

Stress analysis
Development capability of whole line electric control system
Traditional PLC program design (Mitsubishi , Omron etc.)
BECKHOFF PLC Assembler programming

Development tool

The programming for movement control

User interface development

Test script development

Test system architecture

Development of analog circuit, digital circuit

Multi-layer PCB Lay

Design of control board, function board



•ISO 9001:2008 authentication certificate
•Strict and professional quality management procedure.
•Thorough quality dataSupplied material check/process check/shipment check


+86-135-8086-8288